A handshake and an email don't cut it in commercial kitchen design. Your client needs a functioning kitchen to run their business, and you need clear boundaries on what you're responsible for and what you're not. The wrong contract or a vague scope of work creates chaos: the client thinks you're handling permitting and electrical design, you think you're only doing layout, and 8 weeks later you're in a dispute over who's covering what.
A strong contract protects both you and your client. It clarifies deliverables, payment terms, revision limits, timelines, and liabilityâso you can focus on design instead of firefighting.
What Your Scope of Work Must Define
A Scope of Work (SOW) is a one to two-page document signed by both parties before work begins. It spells out exactly what you will deliver and what you won't. Start with a clear description of the project: "Design of a 1,200-square-foot restaurant kitchen for a 60-seat Italian restaurant, including layout, equipment specifications, 3D renderings, and health code compliance review."
Then list deliverables in detail. Example: "Three 2D floor plan options at 1/4-inch scale showing equipment placement, gas lines, water lines, electrical outlets, and drainage. One selected 3D rendering. Equipment specification sheet with make, model, dimensions, and cost. Health code compliance checklist confirming layout meets [County] health department standards. One revision round on selected layout; additional rounds at $100/hour." The more specific, the better.
Now define what's NOT included. "Design fee does not include: obtaining permits, coordinating with contractors, site inspections during construction, HVAC design, electrical engineering design, plumbing design, equipment installation, flooring, painting, or liaison with health department." This is critical. Many clients think "designer" means someone who handles everything. You're a kitchen designer, not a general contractor or engineer.
- Describe the project in clear terms (square footage, restaurant type, service style)
- List every deliverable: floor plans, renderings, spec sheets, code review, etc.
- Specify revision limits (usually 2 rounds included; additional at hourly rate)
- Explicitly state what's NOT included: permits, engineering, installation, inspection
Payment Terms and Fees
Spell out your design fee upfront and payment schedule. Many commercial kitchen designers use a three-stage payment structure: 50% of design fee upon signing the contract, 25% upon presentation of the first draft layout, and 25% upon delivery of the final approved design with all spec sheets. This ensures you're paid for your time as the project progresses.
If you're also handling equipment procurement, clarify that you'll present a final equipment list and cost estimate. Some designers charge a separate equipment sourcing fee (e.g., $500â$1,500) on top of the design fee. Others build it into a percentage markup on equipment totals. Specify clearly: "Equipment markup of 20% applies to final specified equipment list. Markup is invoiced separately upon equipment orders being placed." Include a note that equipment costs are estimates and subject to change based on final supplier quotes.
Specify the client's payment terms for equipment if you're sourcing and procuring. Are you ordering on their behalf? Do they pay you upfront or net-30 after delivery? Clarify this so there's no confusion about cash flow.
- Design fee: state the exact amount (e.g., $5,500)
- Payment schedule: 50% upfront, 25% at draft, 25% at completion (common structure)
- Equipment markup: state the percentage (e.g., 20%) and when it's invoiced
- Note that equipment costs are estimates subject to final supplier quotes
Revision Limits and Change Orders
Unlimited revisions will tank your profitability. Your scope should include a fixed number of revision roundsâtypically two for the initial layout phase and one for the final spec sheet review. Define what counts as a revision: "Changes to layout, equipment selection, or specifications based on client feedback. Revisions do not include corrections to errors made by the designer."
Anything beyond those rounds is a change order. "Additional revision rounds beyond the included rounds are billed at $100/hour, invoiced monthly." This protects you from the client who wants a new layout every week because they keep changing their mind about equipment placement.
Also include a timeline for client feedback. "Client will provide feedback on draft layouts within 5 business days. Projects may incur delay fees if feedback timelines exceed 10 days, billed at $75 per day." This sounds harsh but it's standard practice and prevents projects from languishing for months.
- Specify revision rounds included in design fee (typically 2 revision rounds)
- Define what counts as a revision (layout, equipment) vs. corrections
- Additional revisions are billed hourly at your stated rate
- Set deadlines for client feedback to keep projects on track
Health Code and Liability Limitations
This is delicate. You're a designer, not a health inspector or engineer. Your scope includes a health code compliance review, but you need to clarify its limits. "Designer will review proposed layout against FDA Food Code and [County] Health Department rules as they are currently understood. This review is based on code documents available as of [date] and does not guarantee approval by the health department. Final layout approval rests with the local health authority."
Add a liability waiver: "Designer makes no guarantee that the final kitchen will pass health department inspection or meet all local regulations. It is the client's responsibility to obtain final written approval from the health department before construction. Designer is not responsible for code violations discovered during inspection, permitting delays, or changes required by the health authority."
You're protecting yourself here. Health code changes, local requirements vary, and occasionally a health official will interpret code differently than you expected. You've designed with best practices and current code, but you can't guarantee the health department's final decision. Make that clear in writing.
- State that health code review is based on current FDA code and local rules
- Clarify that final approval rests with the health department, not you
- Include a liability waiver: you're not responsible for code violations or inspection failures
- Recommend client obtain final written approval before construction starts
Intellectual Property and Ownership
Your design work is your intellectual property. The contract should state that you retain copyright to the design, renderings, and specifications. The client owns a license to use the design for their kitchen project, but they can't repurpose your design for another location without paying a fee.
Example language: "Client receives a non-exclusive license to use the design, floor plans, and specifications for the specified project at [location]. Client may not reproduce, modify, or use the design for other locations or resale without written permission and additional fee. All original design work, renderings, and intellectual property remain the property of the designer."
This matters if you're a successful designer and clients try to use your design for expansion locations or resell it. A clear ownership clause prevents disputes.
- You retain copyright to the design and all original work
- Client gets a license to use the design for their specific project only
- Client cannot reproduce or adapt the design for other locations without permission
- Include language protecting your intellectual property in writing
Timeline and Project Milestones
Set a clear project timeline. "Design phase: 2 weeks from signed contract. Client provides feedback by [date]. Revised layout: 1 week. Final specifications and renderings: 1 week. Total project duration: 4â6 weeks pending client feedback timeliness." This sets expectations and gives you a target.
Include milestone dates for deliverables: "Draft layouts due [date]. Final layout approval due [date]. Equipment specifications and cost estimate due [date]." This keeps both parties accountable.
Note any external dependencies: "Timeline assumes client site visit occurs within 3 days of contract signing and client contact is available for periodic feedback calls during the design phase." If the client disappears for 3 weeks, that's not your fault.
- State typical project duration (4â6 weeks is standard for single-kitchen design)
- Include milestone dates for draft, feedback, revisions, and final delivery
- Note client responsibilities (availability, feedback timeliness, site access)
- Include language protecting your timeline if client delays feedback
The bottom line
A solid commercial kitchen design contract includes a detailed scope of work, clear payment terms, revision limits, health code disclaimers, timeline milestones, and intellectual property protections. It protects you from endless revisions, scope creep, and disputes over who's responsible for what. If you're managing contracts manuallyâexchanging versions via email, revising terms each time, or forgetting to include key protectionsâyou're leaving yourself exposed. A toolkit with templated contracts and scope documents, customizable to your services, ensures every project starts clean and reduces admin overhead so you can focus on design.